Twinworks Factory Simulation

Simulate a production line: throughput, lead time, WIP, OEE and the bottleneck, with CIs.

A Twinworks project (.twinworks.json, format "twinworks-project") or a bare model with "nodes" and "links". Times in seconds, lengths in metres. Leave empty and pick a template instead.

h

Overrides the model setting (includes the warm-up).

min

Statistics are reset after the warm-up. Overrides the model setting.

Same seed → same result. Replication r uses a seed derived from it.

Independent runs with different seeds; used for the confidence intervals.

Try an example: 3-station line template, 5 replications · Own model: two machines and a buffer, deterministic · Line with failures over 2 days, 3 replications

How it works

Runs the Twinworks discrete-event simulation on a factory model (sources, buffers, machines with failures and setups, assembly, conveyors, quality checks, operators and shift calendars). Returns throughput per hour, lead time, WIP with a Little’s-law check, per-station states and OEE, the bottleneck and a cost per good part, with Student-t confidence intervals across seeded replications.

  • Discrete-event simulation with a binary-heap event calendar; ties are processed in (time, priority, insertion order) so every run is reproducible.
  • Parts are pushed downstream with blocking after service: a machine that cannot hand its part on is “blocked”; a machine without parts is “starved/idle”.
  • Each random quantity (arrivals, cycle times, failures, routing choices) has its own seeded stream, so scenario changes do not shift other random numbers (common random numbers).
  • Statistics are reset after the warm-up. Replications use derived seeds; intervals are Student-t intervals of the replication means.
  • Little’s law is checked as L (time-average WIP) versus λ·W (departure rate × mean time in system); differences above 5 % signal a non-stationary system or too short a run.
  • OEE = availability × performance × quality with planned time = time on shift minus planned maintenance; availability losses = breakdowns + setups; performance = ideal cycle time × parts ÷ run time (starving and blocking reduce it); quality = good ÷ processed.
  • Bottleneck: active-period method (Roser et al.) — at each moment the station with the longest uninterrupted active period (working, setup, repair, maintenance, waiting for an operator) is the bottleneck; overlaps between consecutive bottlenecks count as shifting.

A simulation is only as good as its input data. Validate cycle times, failure data and routings against your shop floor before making investment decisions.

Sources

For scripts and AI agents

  • JSON API: POST https://twinworkssimulate.usefulweb.site/api/v1/calculate (same calculation as this page)
  • Interface description: OpenAPI 3.1 · AI guide: llms.txt
  • MCP server (Streamable HTTP): https://twinworkssimulate.usefulweb.site/mcp · tool name twinworks_simulate
Example request
curl -s -X POST https://twinworkssimulate.usefulweb.site/api/v1/calculate \
  -H 'content-type: application/json' \
  -d '{"template":"three-station-line","replications":5}'